Ribbon Cutting Ceremony for the PSCC Renovation project
Division: OUC, DGS
Meeting: Ribbon Cutting Ceremony for the PSCC Renovation project
Location: 310 McMillan Drive NW
DGS Representative(s): EAU,
09/08/2025 Job Announcements |
As the implementation agency for all District owned and managed facilities, the Department of General Services (DGS) takes proactive steps to fortify our Heating, Ventilation and Air Conditioning (HVAC) systems and internal air filtration systems for the safety and well-being of District residents.
The Government of the District of Columbia, acting by and through its Department of General Services (the “Department” or “DGS”), has an immediate and critical need to engage AAA Complete Building Services, Inc. (the “Contractor”) to continue providing Comprehensive, Consolidated Maintenance Services including facility Operations, Maintenance & Repair Services (“OM&R”) (the “Services”) for the Consolidated Forensics Laboratory, located at 401 E Street, SW , Washington, DC 20024 (the “Facility”), for a period of four (4) months.
Division: CCSD
Meeting: Harriet Tubman ES Topping Out Celebration
Location: 3101 13th Street NW 200010
DGS Representative(s):
Topic: Harriet Tubman ES Topping Out Celebration where the final piece of steel is placed for the building.
Division: CCSD
Meeting: MXG Topping Out Ceremony
Location: Malcolm X School | 1500 Mississippi Ave SE 20032
DGS Representative(s):
Topic: This is a save the date for the Malcom X Topping Out where the final piece of steel is placed for
the building.