O Street Wall Restoration Project

Project Description:

The O Street Wall Project, situated on multiple properties on the 3200 block of O Street, SE, involves the Design-Build Stabilization of the retaining wall. This project includes a corrective action plan to enhance the 1,000-foot-long, 25-foothigh structure. The plan focuses on mitigating soil erosion and sedimentation issues, repairing spalling concrete, and removing rust to strengthen the wall's structural integrity. Additionally, a structural movement monitoring (seismic) system will be installed, along with a continuous monitoring program.

Project Details:

Address: 3204 O St SE
Ward: 7
DGS Project Manager: Solomon Ikotun
Client Agency Project Manager:
Project Status: Design
Architect: Studiolaan Architects
General Contractor: SPD Contracting Inc.
Current Budget: $1,070,000
Construction Start Date: Winter 2025
Construction End Date: Fall 2026
DGS Contact: Shama King