The District is committed to achieving success by delivering capital construction projects on time and on budget.
DGS Municipal Projects
Ward 1
DBH - DC Stabilization and Sobering Center Renovation - Park Rd Facility (Ward 1)
The project scope includes the renovation of an existing FEMS Engine Company 11 Building for the second DC Stabilization and Sobering Center.
Junior Achievement Launchpad of Greater Washington Project (Ward 1)
The concept of the project is to convert a 13,200 GSF Historic building from general office use to a flexible space for use by the Junior Achievement of Greater Washington.
Ward 2
DC Archives – Naylor Rd Project (Ward 2)
The District of Columbia Archives holds historical and permanently valuable records of the DC Government such as birth and death records, wills, land records and marriage records.
John A. Wilson Building HVAC, Interior, Exterior Upgrades (Ward 2)
The project is to assess, upgrade, and repair the building's HVAC system; the design team will also investigate and design a resolution for water intrusion for the window wells along 13 1/2 St, 14th, and D Streets, replace the outdoor lighting with LED lights along Penn Ave NW, and complete a window upgrade throughout the building.
Marion S Barry Building Exterior Stabilization Project (Ward 2)
The project scope includes exterior stabilization of the site. This includes exterior claddings, window leakings, pavements around the building, and stormwater drainage system improvement.
Ward 3
Archive Building - Design & Construction
The Office of Public Records (OPR) is a division under the District of Columbia’s Office of the Secretary.
DC Archives – UDC Building #41 Project (Ward 3)
The new archival facility will address the records center storage needs of the District and provide a facility that meets the standards for records centers.
Ward 4
Ward 5
DACL Model Cities Senior Wellness Center - New Addition (Ward 5)
Provide additional space (1,115 sq. Ft.) to serve as a multi-purpose space which includes a unisex bathroom and additional parking spaces.
DOES - District of Columbia Infrastructure Academy (DCIA) Renovation (Ward 5)
This DC Infrastructure Academy (DCIA) project will support the existing Spingarn High School and the site's alteration, expansion, and renovation.
DPW Ft. Totten Solid Waste Transfer Station (Ward 5)
Demolition of existing asphalt covers, hauling the debris, installing new asphalt with necessary coatings, keeping stormwater flow towards the man/utility holes and inlets and parking stripes.
DPW Fleet 1725 15th Street Roof Replacement Project (Ward 5)
This project scope includes the replacement of the roof.
DPW Packer Shop Roof Replacement Project (Ward 5)
This project scope includes the replacement of the roof.
OSSE Bus Terminal Development Project (Ward 5)
This Project will create a new Bus Depot for OSSE-DOT. The Project site development for on-site parking for busses, support staff, and drivers.
Ward 6
Eastern Market Bollard Project
The scope of the project includes various construction work, including stone replacement, brick replacement, moisture control, sunroof seal repair, receptacle replacement, provision and installation of fire alarm and electronic security system, and provision and installation of freight elevator and installing bollards.
OCFO HQ Building - 1101 4th St SW (Ward 6)
Ward 7
Ward 8
DHCD Tenant Interiors Improvement Project (Ward 8)
This project is a Ground-up development led by the Menkiti Group, managed by DGS to improve, and redesign the DHCD Tenant Interiors space of 55,000 sq. ft.
HSEMA/OUC Center Renovation Project (Ward 8)
This project significantly upgrades the Annex Building and includes major renovation. The construction will be performed in two phases: Phase 1—Renovation of Annex Building, and Phase 2—Renovation of 2nd Floor.
Saint Elizabeth's Hospital Emergency Power System Upgrade (Ward 8)
Design-Build project for the upgrade of the emergency electrical power system for the Saint Elizabeth's Hospital.
St. Elizabeth's Hospital Thermal Docking Station-Dinex System Upgrade (Ward 8)
Upgrade the Thermal Docking Station-Dinex System in the hospital.
Ward 8 Senior Wellness Center (Ward 8)
This project involves the new construction of the Ward 8 Senior Wellness Center. The new space will be constructed within the existing Kramer Middle School Parking lot grounds, and it will include support spaces that promote senior wellness activities, such as a gym, meeting rooms, and educational space.