Project Description:

Jelleff Community Center will be designed and built into an all-inclusive facility catering to people of all ages and abilities. Building amenities shall include but are not limited to:

  • Full Sized Basketball Gym with two (2) cross courts and bleachers
  • New common atrium area
  • A workout room that could be populated with exercise machines
  • Expanded locker facilities that could also be used by pool patron and accessible from both inside the building and the exterior
  • Flexible meeting rooms located near a catering kitchen
  • Activity and Game Rooms
  • Accessibility as defined by the Americans with Disabilities Act for all, via an elevator that reaches all levels and an at grade entrance to the primary building lobby

Project Details:

Address: 3265 S Street, NW
Ward: 2
DPR Project Manager: Peter Nohrden
DGS Project Manager: Jose Lopez
Project Status: Design
Feasibility Study by: Perkins-Eastman
Design Start Date: Fall 2022
Design End Date: TBD
Project Delivery: Design-Bid-Build
Architect: DLR Group
General Contractor: MCN Build
Current Budget: $28M
Construction Start Date: Summer 2026
Construction End Date: Late 2027
DGS Contact: Brittany Hughes

 Construction Update:

Presentations: