Lafayette-Pointer Water Mitigation and Field Replacement

Project Description:

The purpose of this project is to mitigate stormwater runoff at Lafayette-Pointer Park that is degrading the southern hillside and damaging the Lafayette Elementary School track and field. This mitigation will be done with a series of stormwater management facilities and modifications to the hillside in order to capture, absorb and divert stormwater runoff. Further, at the conclusion of the hillside work, the track and field will be replaced, including improved grading and drainage.

Project Details:

Address: 5900 33rd Street NW
Ward: 4
DPR Project Manager: Brent Sisco
DCPS Project Manager: Shilpa Khatri
DGS Project Manager: Derrick Johnson
Project Status: Design
Project Deliver: Design-Build
Architect: Drummond / Wiles Mensch
General Contractor: HEP Construction
Budget: $3.25 million
Start Date: Spring 2024
End Date: Winter 2024-25
DGS Contact: Chellese Grove